Challenge: Existing chiller was operating at a disruptive volume for the library and the neighboring multistory, high-end condominiums.
Challenge: BCDC needed an HVAC upgrade to improve air quality and comfort but was extremely space-constrained.
Challenge: Havtech Service Technicians needed a solution to provide seamless communication and transparency to customers
Challenge: Design the Largest Net Zero Energy School in U.S. and Achieve Excellent Indoor Air Quality
Challenge: Maximize LEED points to achieve LEED Gold, reducing project life cycle costs, and enhancing indoor air quality.
Challenge: Provide premium thermal, humidity and acoustical comfort for the tenants with an efficient HVAC system.
Challenge: Maximize utility rebates and increase LEED from Silver to Gold.
Challenge: Build the most energy conscious and efficient school in the state.
Challenge: Integrate specialized HVAC equipment into the region's largest sports complex.
Challenge: Convert Storage POD units in order to house COVID-19 patients.
Challenge: Deliver high quality mechanical systems throughout the project with limited work force.
Challenge: Maximize usable interior space to allow for the hospital’s future growth.
Challenge: Expand existing build while minimizing impact on current tenants.
Challenge: Minimize impact on historic structure while delivering individualized temperature control.